top of page

Previous Work

Kitchen renovation before.......
Bathroom renovation before.......
.....Kitchen Renovation After 

Work incuded large chimney removal, install steel support, ceiling & wall re plastering, replacing rotten joists, new floor tiling, Installing new boiler and re locating, Complete kitchen re fit & wall tiling.

......Bathroom renovation After

Work incuded removal and re location of water tank, removal of shower & shower cubicle, ceiling & wall re plastering, replacing rotten joists, new tiled Fired Earth flooring, complete bathroom re fit & wall tiling.

In addition to the bathroom the client also had an outside toilet &  brick storage room converted in to a downstairs shower room.

Kitchen Extension....

On this project we built an kithen/ diner extension to the side of the existing propery, We then fitted the complete kitchen. Sorry no before pics.

Hallway renovation before.......
Log Burner Installation ......

This client originally had a plain white plastered fireplace, we removed the plastered from the back of the fireplaced exposing the original brick we then installed the log burner and flue. The customer wanted a feature fireplace that gave the wow factor so we tiled the front of the chimney with decrotive tiles and installed a wood shelf made from reclaimed wood.

Hallway renovation after.......

Yeap this is the same hall! Here we had to replace the original floorboards, we layed a floor suitable to tile onto, we then layed replica victorian tiles throuout the hall, We changed the radiator and re plastered the walls, ceiling and we restored the archway.

During Installation.......
Completed Installation & Tiling....
bottom of page